A large OEM committing to commercial production does something no pilot line can: it tells the supply base the chemistry is worth tooling for. That signal moves capacity, qualification queues, and raw-material contracts long before it moves a spec sheet.

Full text pending. This piece exists in the backdated archive. The complete text, the gated “Download PDF” flow, and the build-time PDF are Phase 2 work — this page is the route and the shell so the structure can be reviewed now.